DRIVERS have been warned about essential works taking place at Monmouth's Gibraltar Tunnels, which means some vehicles will need to use alternate routes to enter Wales.
A contraflow arrangement will be set up at the A40 Gibraltar Tunnels while maintenance and survey works take place in both the northbound and southbound tunnels.
Diversions will be in place between 8pm and 6am on Tuesday, September 17, until Wednesday, September 18.
All wide abnormal load – vehicles with a width greater than 3 metres and length up to 16.5 metres – will be requested to use the M5 and M4.
🚧 Roadworks 🚧
— Traffic Wales South (@TrafficWalesS) September 17, 2024
📍 #A40 Gibraltar Tunnels
📅 16/09 -17/09 ⌚ 20:00 - 06:00 | Northbound closure. ⛔
📅 17/09 - 18/09 ⌚ 20:00 - 06:00 | Southbound closure. ⛔
Diversion in place. pic.twitter.com/2HEKuzLubO
There will be advance signage on the roads to advise motorists to plan ahead.
Comments: Our rules
We want our comments to be a lively and valuable part of our community - a place where readers can debate and engage with the most important local issues. The ability to comment on our stories is a privilege, not a right, however, and that privilege may be withdrawn if it is abused or misused.
Please report any comments that break our rules.
Read the rules here